INTAJ LLC has recently introduced the Wireline service line into its operations having secured a long term Slickline services contract in the Sultanate of Oman.
The Slickline crane unit combines a wireline unit and telescope crane mounted on a heavy duty off‐road chassis, with step less variable hydraulic drive for powerful winch. It has been designed for measurement and workover activities with wire capacities above 7,650 m / 25,000 ft. Both Slickline and E‐Line jobs can be performed. Flexibility, high speed and high pull force at any depth characterize our wireline winches.
INTAJ can provide the recourses to conduct the following typical Slickline jobs however is not limited to this scope of work and can provide technical solutions as per client requirement:
- Performing drift runs
- Running and pulling gauges in completed wells.
- Running and pulling downhole shut‐in tool (DHSIT), bottom‐hole samplers and memory production logging tools (MPLT) as required
- Conducting gradient surveys
- Running and pulling isolation plugs in completed wells.
- Running and pulling gauge hangers with gauges
- Running Lead Impression Blocks (LIB) readiness
- Fishing, if required
- Shifting sleeves
- Gauge cutter and centralizers
1.1 Wireline Logging Services
INTAJ can provided a wide range of memory logging solutions depending on client requirements and problem spots including by not limited to :
- MPLT logs (full bore spinner, pressure, temperature, gamma, CCL, density and capacitance) with a high temperature options available upon request.
- 24 multi‐finger caliper for well integrity logging.
- Spectral Noise Log for WELL‐RESERVOIR PERFORMACE EVALUATION.
- Multi Barrier Thickness Tool MBTT designed to evaluate the integrity of the well by determining the remaining thickness of the casings (metal loss) and completion without pulling completion string out of hole.